LBJ /IH-35E Transportation Enhancements / Aesthetic Master Plan

Dallas, Texas

TxDOT had decided to let the new Managed Lane project on LBJ Freeway (IH-635) and IH-35E to be a design-build project.  Phillips’ team was awarded the project aesthetic designs by the contractor, Trinity Infrastructure.

 

Phillips’ team started designing the landscape and hardscape in December 2009.  Several themes to the highway were studied.  The final aesthetic selected was an arrow pattern with a large star emblem placed in the managed lanes under the bridges.

 

Each bridge received its unique character and landscape design.  Sound walls were also designed with the LBJ arrow pattern.

 

CLIENT:

TxDOT

Trinity Infrastructure, LLC
Ferrovial Agroman

BUDGET:

$10 MILLION

 

DATE DESIGN STARTED:

December 2009

DATE CONST. STARTED:

January 2011

DATE CONST. FINISHED:

October 2013

CONTACT:

Ignacio Navarro, Trinity Infrastructure

182A Tollroad Transportation Aesthetics Master Plan

Austin-Cedar Park-Leander, Texas

CTRMA (Central Texas Regional Mobility Authority) were planning for a tollroad as a bypass and extension of US 183.  The new 183A bypass would go around the communities of Cedar Park and Leander, Texas.  Phillips’ team was asked to develop a thematic aesthetic design package for the corridor in 2004.

 

The final theme was focused around the hill country and the environmentally sensitive nature of the region. 

 

CLIENT:

TxDOT

CTRMA

BUDGET:

$12 MILLION

 

DATE DESIGN STARTED:

February 2004

DATE CONST. STARTED:

June 2006

DATE CONST. FINISHED:

October 2007

Woodall Rodgers Interchange to Calatrava Bridge

Dallas, Texas

TxDOT had to connect to the new Calatrava Bridge across the Trinity River.  So a new interchange was proposed on IH-35E at Woodall Rodgers where the Calatrava Bridge was located.  Phillips’ team was asked by TxDOT to create a new transportation aesthetic for the interchange.

 

Phillips’ team started designing the landscape and hardscape in April 2005.  Several themes to the highway were studied.  The final aesthetic selected was an abstract of the Calatrava bridge cable pattern.

 

Construction was completed in 2012.

 

CLIENT:

TxDOT

BUDGET:

$6 MILLION

 

DATE DESIGN STARTED:

April 2005

DATE CONST. STARTED:

March 2007

DATE CONST. FINISHED:

October 2012

CONTACT:

Richard Mason, ASLA

TxDOT